METRO RAIL DESIGN CRITERIA SECTION 9 / SYSTEMS
DE304.09 9-156 Revision 4 : 05/09/12
Metro Baseline Re-Baseline: 04/29/10
b. Within embedded track sections, negative rail grounding stations shall
be provided at a minimum at all sectionalization locations.
END OF SECTION
Comments to this Manuals