American Audio VELOCITY - REV 4-05 Operations Instructions Page 52

  • Download
  • Add to my manuals
  • Print
  • Page
    / 191
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 51
METRO RAIL DESIGN CRITERIA SECTION 9 / SYSTEMS
DE304.09 9-47 Revision 4 : 05/09/12
Metro Baseline Re-Baseline: 04/29/10
In normal operation, routes shall clear automatically for consists without intervention by the
train operator. At terminal stations the train operator shall be able, via TWC, to request that
the departing signal be cleared for the train to proceed. Trains shall be normally routed
reverse across before reaching the station as the preferred route, or the normal direction
route if the preferred platform is occupied.
The ATC system shall use train ID, transmitted by the TWC system, in order to
automatically route trains at junctions and turnback points for their designated route.
Fleet, if implemented, shall be provided for the normal traffic direction only.
9.4.2.8.1 Selection of Routes from the Train
Train-to-Wayside Communication route selection shall be provided at all interlockings, and
at the terminal station.
9.4.2.8.2 Local Route Selection Capability
Local control capability shall be provided to ensure the safe operation of trains by means of
Local Control Panels (LCP) in each signal house.
The LCP shall indicate track circuit occupancy, signal status, switch position and
correspondence, switch locking, traffic direction, manual control, automatic control, and
crossing gate position.
9.4.2.9 Wayside Signals
9.4.2.9.1 Main Line
LED wayside color signals shall be provided to indicate movement authority, block
occupation and route locking information to train operators. Signals shall be installed to
govern movements into and through interlocking limits.
Wayside color signals shall show the following aspects, which are in compliance with Metro
rules:
Aspect
Meaning
Red/Red Stop
Flashing Green/Red Block clear. Proceed on normal route. Trains operating with
ATP Bypass activated shall be prepared to STOP at the next
interlocking Signal.
Green/Red Block occupied. Proceed on normal route with Cab Signals.
Trains without cab signals or operating with ATP Bypass
activated shall STOP and contact ROC.
Red/Flashing Green Block clear. Proceed on diverging route. Trains operating with
ATP Bypass activated shall be prepared to STOP at the next
interlocking Signal.
Page view 51
1 2 ... 47 48 49 50 51 52 53 54 55 56 57 ... 190 191

Comments to this Manuals

No comments