METRO RAIL DESIGN CRITERIA SECTION 9 / SYSTEMS
DE304.09 9-iii Revision 4: 05/09/12
Metro Baseline Re-Baseline: 04/29/10
9.17.2 Communications (COMM) Equipment Room..................................................135
9.17.3 CTS.................................................................................................................135
9.17.4 Telephone Service..........................................................................................135
9.17.5 Public Address................................................................................................135
9.17.6 SCADA ...........................................................................................................136
9.17.7 Intrusion Detection..........................................................................................136
9.17.8 Fire Detection and Suppression Monitoring....................................................136
9.18 TRACTION POWER AND DISTRIBUTION SYSTEM ..................................................136
9.18.1 General...........................................................................................................136
9.18.2 Scope..............................................................................................................137
9.18.3 Codes and Standards .....................................................................................137
9.18.4 Equipment Standardization.............................................................................137
9.18.5 Traction Power Substations............................................................................138
9.18.6 Sectionalization, and Emergency Trip System-ETS .......................................143
9.18.7 Trainway Feeder and Emergency Back-up Power Supply .............................144
9.18.8 Wayside Distribution.......................................................................................145
TABLES
Section
Table Number Title
9.3.2 9.1 Braking Rates for Light Rail Vehicles
N/A 9.2 Not Used
9.8.1 9.3 Input Priorities
FIGURES
Section
Figure Number Title
9.3.2 9.1 Light Rail Vehicle Dimensions and Design Loading
9.5.2.C 9.2 Equipment Grounding
9.3.2 9.3 Not Used
9.8.2 A Character and Number Height Versus Viewing Distance
9.8.2 B Typical Overhead Signage
Appendix A – Remote Terminal Unit
Appendix B – SCADA RTU Interface Requirements
Comments to this Manuals