METRO RAIL DESIGN CRITERIA SECTION 9 / SYSTEMS
Appendix A
DE304.09 Appendix 9A-9
Metro Baseline Re-Baseline: 04/20/10
2. Upon receiving a SCADA control word value of “0” the RTU shall take no
action.
3. Upon receiving a SCADA control word value of “1”, the RTU shall set the
control word to a value of “0”, and then activate the associated output relay
for a momentary time period.
4. Upon receiving a SCADA control word value of “2” the RTU shall set the
control word to a value of “0”, and then activate the associated output relay.
5. Upon receiving a SCADA control word value of “4” the RTU shall set the
control word to a value of “0”, and then deactivate the associated output
relay.
6. Receipt of any other SCADA control word value not listed above shall result
in no action.
7. Momentary activation time shall be configurable in ladder logic for each
individual control down to 250 milliseconds. The Contractor shall determine
the value needed for each control output.
G Remote I/O management
1. The typical RTU program shall accommodate one expansion chassis and
up to two remote I/O chassis with a typical configuration as defined in Table
1 - SCADA Memory Map.
2. Adding and enabling remote I/O shall only require the following actions:
a. Install a remote I/O communications module
b. Enable the I/O using the manufacturer provided PLC programming
software to configure the remote I/O module and I/O and enable
memory map transfer as a simple edit to the ladder logic
3. Once enabled, the RTU ladder logic shall monitor the status of the remote
I/O link communications and redundancy and report it in the status register
area of the SCADA memory map.
3.4 SOFTWARE
A The Contractor shall provide a base ladder logic and application programming
necessary to implement the functional requirements of the RTU as described in
these technical provisions.
B The software shall be designed for simple modification to implement site specific
requirements.
C The Contractor shall be responsible for configuration management of the base
software throughout the warranty period and shall make and distribute revisions
to address defects and change orders.